Construction of oilfield sand terminal capable of storing 12,900 tons of material with a transfer rate of 400 tons per hour. This project consisted of (4) 64,800 CF gravity surge bins, (2) drive-thru truck loading bays with 120’ long truck scales, (2) rail dump stations, (1) truck dump station, elevator leg with 150’ discharge height, conveyor belt with belt scale, spouting & equipment, office/MCC building, security & monitoring system, and electrical & controls. Brown-McKee, Inc. provided design for concrete foundations, matt slab, & paving, elevator boot pit, conveyor tunnel, receiving hoppers, and office/MCC building. Click below to see larger images or return to projects.